Permanent Power Supply

PEEL Permanent Power Supply

Peel Business Permanent Supply Form


Please use this form to apply for a new single Permanent Supply Connection.

To assist us to provide you with services, we need to collect personal information about you. We will treat your information in accordance with our privacy policy, a copy of which is available upon request. If you have Life Support equipment at your home or premise, we want to ensure that you will be safely connected and understand how to register, so please call us on 08 9416 2026.

Note: All fields marked with an asterisk (*) are mandatory. Please fill the information in CAPITAL letters.



Permanent Supply Connection

In this section, we will ask you for information that will enable us to connect your address to a Permanent Supply of electricity, so you can build your premise.

Note: There is a Permanent Supply Connection Invoice to which payment is required to commence the process; this will be issued to the Permanent Supply Connection Applicant details captured in Part 1.


Part 1: Permanent Supply Connection Applicant Details

A Permanent Supply Connection Application will be processed against the Applicant details provided below.

Business Postal Address
Representative Name
Correspondence Preference
Note, if you select email copy, we will send you correspondence and invoices by email and you will not be provided with a paper copy of correspondence or your Peel invoices.

Part 2: Authorised Builder or Electrical Contractor (if applicable)

You can nominate an (or another) Authorised Builder or Electrical Contractor to engage with us in relation to establishing this Permanent Supply Connection, including us providing details about the Permanent Supply Connection.

Builder/Contractor Name
I now appoint and authorise the Authorised Builder or Electrical Contractor to receive information about my Peel Renewable Energy Permanent Power Connection, at the supply address listed in Part 3 for the authorisation period outlined.
Your browser does not support the Signature field

Part 3: Permanent Supply Connection Address Details

This is the intended address you want to establish the Permanent Supply Connection for. The land titles must be released, and the address provided must match the titles according to the shire or Landgate. If the property is, or will be strata titled, please provide the parent lot number on this application, or refer to the Shire of Murray for more information.

Supply Address

Part 4: Type of Electricity Supply

This section is intended to understand the supply you will require at the Permanent Supply Connection Address.

Permanent Supply Connection type?
Note: Additional fees and processes may apply for Non-Standard Connection Types.
Do you require a Current Transformer (CT) Meter?
Note: A CT (Current Transformer) Meter is installed on any connection with a load greater than 100 Amps.
A CT Meter only measures a fraction of the current passing through the connection and a multiplier is applied to this reading to reflect the actual current.
Do you require a HV or LV supply?
Note: Low voltage substations are generally suitable for loads up to 3MVA. Peel owns and is responsible for all equipment within the substation. High voltage options are generally suitable for loads above 3MVA.
The customer owns and is responsible for all equipment within the substation other than Peel's metering unit and any high voltage switches connecting the substation to the Peel network.
What is your estimated annual spend on electricity at the property upon completion?

Part 5: Equipment Details

Please provide details for each significant piece of equipment to be installed at the premises.

Significant Equipment at Premises

Motor Details (complete for each motor as known)

All Other Significant Equipment (Complete for each piece of equipment as known)


Part 6: Attachments

Select the items you are providing with this application.

Attachment Types (note: Check each as available for provision)

Part 7: Condition Acceptance

Please read Conditions of request to provide a formal quote below.

Condition Acceptance

Part 8: Account Holder (Applicant) Signature Panel

By signing this form, you are confirming that all the information in Parts 1 - 7 above is accurate and true, and you understand that a Permanent Supply Connection will be created, and subsequent Permanent Supply Connection activities will occur, and you agree to the terms provided here in this form, in addition to the terms of Peel's Standard Form Contract, as approved by the Economic Regulation Authority from time to time, except to the extent otherwise agreed.

Your browser does not support the Signature field
Name



Next Steps

Once completed, press Submit.
A Peel Team Member will review your application and be in contact with you soon.


Conditions of request to provide a formal quote

*No obligation to proceed

Submission of a new Temporary Supply Connection application does not oblige you to proceed with a new Temporary Supply Connection and the associated electricity infrastructure works unless you accept Peel's formal quote.

*Large Connections

If your connection will have a total maximum load greater than 1,000kVA or 10% of the relevant systems peak load, Peel reserves the right to amend these terms and conditions or impose new conditions in connection with your Connection Application. Peel will need to apply the Customer Connections and Contribution Guidelines to the new connection.

*Design Fee

A formal quote is free of charge for connections that have a total maximum demand of 5 kVA or less. A design fee is payable for connections with a total maximum load of more than 5 kVA or connections which will require a CT Meter. The Design Fee is specified in the Fees and Charges section of Peel's Customer Connection and Contribution Guidelines which you can request a copy of, from our Customer Service Team. Peel shall issue you with a tax invoice for the Design Fee (if applicable) after Peel received the completed New Electricity Connection Application form from you. Peel will only commence preparation of the detailed design and formal quote when this fee (if applicable) is paid. Cost of the Design Fee may increase if the actual costs incurred by Peel in preparing the detailed design and formal quote exceed the design fee, the difference will be incorporated in the formal quote and will be payable by you in accordance with the terms and conditions attached to the formal quote.

*Design fee non-refundable

The Design Fee is not refundable, even if you decide not to engage Peel to proceed with the electricity infrastructure works.

*Additional charges

Peel may impose an increase to charges or impose new charges in accordance with the Customer Connection and Contribution Guidelines and will do its best to ensure that you are provided with prompt notice of any such increases or new charges.

*Statutory approvals and clearances

You are responsible for obtaining any statutory approvals in relation to the proposed electricity infrastructure works at your own cost, including planning approval and approvals in relation to heritage, Native Title, Aboriginal heritage, flora and fauna, or any vegetation clearances from the appropriate government body or agency.

*New Connection arrangements are separate to electricity supply arrangements

If you accept the formal quote, this does not address the requirement to have an electricity supply agreement in place in relation to the supply of electricity at the premises. Except to the extent that you have already made arrangements for the supply of electricity to the premises, Peel will provide you with an offer to supply electricity at the premises along with the formal quote.

Once read, please press Submit.